How to charge for building design private work?

Want to know how to charge for construction solutions privately? In addition, what are the highly well -known architectural programs?

4 thoughts on “How to charge for building design private work?”

  1. Seeing you ask, you should be a novice. If you want to pick up the building design privately, you don’t know how to price it, or where to pick up the building design private work, you better go to some platforms with a third -party guarantee transaction. The price, the design tasks inside are the price, and the guarantee transaction, not afraid of being deceived. There is a risk of picking up the private work of building design. Many novice designers have no experience and finally given the design drawing but cannot get the design fee. Essence In this way, you don’t have to worry about the design fee, and you can also save you about the design business. You can easily make money if you do a good job.

  2. Pay content for time limit to check for freenAnswer dear, hello, I will help you answer this question, and you are answering for you. Please wait a little bit. I hope my answer can help you and wish you a happy life.nHello, depending on the cost, the cost is 1.6%— 4.5%. Essence Essence The higher the cost, the lower the rate, the more annoying. You are interested in watching it slowly. Below is a civil building. 1. Toll items 1. Engineering design fees: Generally include preliminary design and budgets, construction drawings design, cooperation with construction, design technology, participation in test drive, and completion acceptance of engineering in accordance with the contract. This charging standard does not include the cost of the construction drawing budget. 2. Preliminary design costs: It is the cost of preparing feasible research reports, agency design tasks, participating sites selection and planning, and environmental pre -evaluation. 3. Non -standard equipment design fee: refers to the design fee of non -standard equipment. Some industry engineering design itself includes equipment design, and non -standard equipment design fees are not taken. 4. Software preparation fee: refers to the factory production process computer control program

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top
Scroll to Top